In Irib, September 1 was held in a madrasa due to the delayed construction of the school.
In the village of Irib in the Charodinsky district of Dagestan, the school assembly was held in a madrasa, as the school building was not ready for the start of the academic year. Residents of the republic criticized officials for the prolonged resolution of the school issue in comments on a social media post about this.
A video about the assembly on September 1 for the students of Irib school in the madrasa was published on Instagram* by the public page tut.dagestan on September 4. In the video, administration staff sit at a table, students are lined up along the walls, the Russian anthem is playing, and Arabic calligraphy is visible on the walls of the room.
"The solemn assembly in the village of Irib was held in a madrasa. Due to the unfinished repairs of the local school, the solemn assembly on September 1 took place within the walls of the madrasa. Students temporarily celebrated Knowledge Day at the new venue. As residents of the village write, they hope that the school repairs will be completed soon," the video description states.
This post on the Instagram* public page tut.dagestan has about 1.6 million followers. As of 08:50 MSK on September 5, it had received 862 likes and 376 comments.
Users identifying themselves as residents of Dagestan were outraged by the holding of the school assembly with the anthem in the madrasa. "Couldn’t it be done without music?" asked koramagomed8.
"Songs in a madrasa, where there are inscriptions from the holy Quran. According to the Quran, songs seem to be forbidden," wrote ver_nice_90.
A madrasa is a Muslim religious educational institution where religious education is obtained, as stated on the website of the Spiritual Administration of Muslims (DUM) of Russia. A mosque is primarily intended for collective prayer and other religious rituals. Thus, a madrasa and a mosque have different main functions: the former is an educational institution, the latter is a place of worship, according to explanations from DUM RF.
Other users criticized officials for the fact that the school issue was not resolved by the start of the academic year. "Ask yourself how it happened that children were left without a school and who is to blame for this," wrote genius25450.
"And why wasn’t the school completed on time?" asked magomed.7080.
"Well, everything will be done by the leaders, just to be praised," noted osmanmagomedov666.
Some commentators focused on the problem of the school building itself and the temporary placement of students. "In Irib, the school is in an emergency state, so the school moved to this building," wrote khabibulaeva.kh.
"And why is no one condemning those who close madrasas, why is a license needed in the mountains? The school moved there temporarily, that is, not forever, then this building will be demolished altogether," noted aminawxrrr.
The building of Irib Secondary School was recognized as unsuitable for further use after deformation of the soil occurred behind the school due to heavy rainfall from March 28 to April 15, posing a landslide threat, reported the publication "Novoe Delo" on May 5. Authorities decided to build a new prefabricated building for the students. In mid-August, the Dagestan government reported that due to the complex terrain and elevation changes in Irib, additional surveys and the development of a site planning project were required. By August 21, the slope was reinforced with rocky soil, a retaining wall, and drainage, after which builders began installing piles and assembling the frame, the republic's government reported. The construction of the new school is planned to be completed by the end of 2026, authorities indicated.
"Caucasian Knot" also reported that issues with a lack of school places, emergency buildings, and prolonged school repairs remain relevant in Dagestan. For instance, on September 19, 2025, residents of the village of Bilbil-Kazmalyar in the Magaramkent district complained about an emergency school building with cracks in the walls and a collapsing ceiling. Authorities then promised to buy the unfinished building of the new school and complete the work.
On August 19, 2023, residents of the village of Soviet in the Khasavyurt district stated that the school repairs had been delayed, and children had been forced to study in a kindergarten building for a long time.